TRAVEL NOTICE: Full overnight closure (10pm-6am) of HWY 217 between Hollister Ave and Sandspit Rd from 8/11–8/13. Please use an alternate route. View project info. View Caltrans traveler info in real time

19810

All SBPL locations will open at 12:30 PM on Tuesday, August 25th. All due dates will be pushed forward. You can access our digital library 24/7.

19832
Banner
Title

Carrillo Street Gym Exterior Renovation Project

Sidebar Widgets

Contact

Justin Van Mullem
Capital Projects Supervisor
(805) 897-1972
JVanMullem@SantaBarbaraCA.gov

Location

Body

The Carrillo Street Gymnasium, a designated City Landmark, was designed in 1926 by architect Julia Morgan, who famously designed Hearst Castle among more than 700 buildings in California throughout her career. The Carrillo Street Gym Exterior Renovation Project will repair and restore the building’s exterior to honor the original design of Julia Morgan while addressing water intrusion that impacts gym use during wetter months.

The exterior renovation includes waterproofing, repairing the stucco and decorative columns, replacing damaged windows, painting, and finalizing the seismic evaluation report. Upon completion, the Carrillo Street Gym will return to being a reliable gymnasium for year-round indoor recreational use.

The renovation is expected to last from Fall 2024 through Spring 2025. During the project, access to the building, its parking lot, and the breezeway between the gym and the Carrillo Recreation Center will be closed. Programming at the Carrillo Recreation Center will not be impacted.