All SBPL locations will be closed from Thursday November 28 through Friday, November 29 for Thanksgiving.

11042
ID
Thousand Steps stairs leading into the ocean
Title

Final Improvement of Thousand Steps Repair Project to Begin April 10

Authored on
Body

The final improvement of the Thousand Steps Repair Project is scheduled to begin Monday, April 10. The stairway is expected to be closed through May while a concrete apron is installed at the beach level to reduce wave energy and extend the life of the lower steps. The City has been waiting for favorable tides to complete this final improvement. 

The historic beach access stairway was built by the City in 1925. Over time, harsh coastal conditions and regular use eroded the lowest stairs, making them difficult and dangerous to use. Significant safety repairs and improvements were made to the stairway during a 6-month closure in 2022. Previous repairs and improvements included:

  • Demolition and reconstruction of the lower 24 steps and installation of seven additional steps to provide a safer and more accessible path during seasonal changes to sand level.
  • Installation of a continuous handrail extending from the street level to the beach.
  • Construction of a new concrete guardrail at the main landing mid-stairway.
  • Drainage improvements to allow for groundwater capture and to reduce algae growth and slippery stair treads.
  • Installation of a bicycle rack on top of the bluff.